How Long Does Refinishing Take?

A realistic day-by-day timeline, including the part after we leave that most schedules forget.

A typical project

Day one: containment, furniture, and sanding. Coarse through fine grits with ceramic solid-backed and mesh paper, edges and corners, then planetary refinement. This is the loud day.

Day two: final prep, and the first coats. With a waterborne system, sealer plus a coat.

Day three: abrasion between coats and the final coat. With stain in the mix, add a day here for the color to dry fully.

Day four: cleanup, containment down, walkthrough, care instructions.

What changes the number

Square footage, obviously. Stain adds a day. Extensive board replacement or repairs add one to two. Stairs are almost always a separate multi-day item because they are hand work. Hardwax oil systems shift the schedule toward longer waits between fewer applications.

The part after we leave

Walkable in socks: same day for most waterborne systems, twelve to twenty-four hours for oils.

Light furniture back: twenty-four to forty-eight hours, lifted and placed rather than slid.

Heavy furniture and appliances: three to five days.

Area rugs: one to two weeks. This one gets ignored the most and causes the most damage — a rug traps solvent and leaves a permanent outline in a finish that has not fully cured.

Living through it

Most clients stay in the home, on an unaffected level. Kitchens and single-level homes are harder; we sequence those in halves where the layout allows it.

We give you the actual dates in writing before we start, including cure milestones, so you can plan around them.