Process — 4 min read
How Long Does Refinishing Take?
A realistic day-by-day timeline, including the part after we leave that most schedules forget.
A typical project
Day one: containment, furniture, and sanding. Coarse through fine grits with ceramic solid-backed and mesh paper, edges and corners, then planetary refinement. This is the loud day.
Day two: final prep, and the first coats. With a waterborne system, sealer plus a coat.
Day three: abrasion between coats and the final coat. With stain in the mix, add a day here for the color to dry fully.
Day four: cleanup, containment down, walkthrough, care instructions.
What changes the number
Square footage, obviously. Stain adds a day. Extensive board replacement or repairs add one to two. Stairs are almost always a separate multi-day item because they are hand work. Hardwax oil systems shift the schedule toward longer waits between fewer applications.
The part after we leave
Walkable in socks: same day for most waterborne systems, twelve to twenty-four hours for oils.
Light furniture back: twenty-four to forty-eight hours, lifted and placed rather than slid.
Heavy furniture and appliances: three to five days.
Area rugs: one to two weeks. This one gets ignored the most and causes the most damage — a rug traps solvent and leaves a permanent outline in a finish that has not fully cured.
Living through it
Most clients stay in the home, on an unaffected level. Kitchens and single-level homes are harder; we sequence those in halves where the layout allows it.
We give you the actual dates in writing before we start, including cure milestones, so you can plan around them.