← All projects

West Asheville, NC

1932 Commercial Space, Vinyl Tile and Adhesive Off

Vinyl tile and adhesive removal, board repairs, full sand and finish of a 1932 commercial space

1932 Commercial Space, Vinyl Tile and Adhesive Off after restoration
1932 Commercial Space, Vinyl Tile and Adhesive Off before restoration
BeforeAfter

This is a 1932 commercial building on Haywood Road in West Asheville — the space that is soon to be Pho House. What was under the vinyl tile was not obvious when we started: layers of tile over decades of adhesive, over original narrow-strip maple that had been sealed under all of it.

Tile and adhesive come off with the drum sander. We ran the Hummel through the field to get the vinyl tile and the mastic up and back to bare wood, then switched to the Bona PowerDrive planetary sander to flatten and refine. Adhesive is what makes a job like this slow — it loads paper fast, so the sequence is worked in stages rather than pushed through.

There was damage that had to come out. Where the subfloor was exposed and boards were missing, we wove new stock into the existing field and filled the seams, then carried the sanding through the patched areas so the repairs would not stand out once color went down.

The plan called for a dark floor rather than natural wood, so the field went out in ProCoat UnoCoat in Special Walnut. Maple starts pale and tight-grained, so that is a real shift in tone rather than a refresh of the color that was already there. As a hardwax oil it soaks into the wood instead of building a film on top, which suits a commercial space that is going to see heavy traffic — wear reads as patina rather than as a scratched-through finish line, and it can be spot-repaired down the road instead of resanded.

In the finished photograph the boards read as one continuous floor. The patched boards are still there if you go looking for them, but the tile, the adhesive and the holes are gone, and the floor is ready for the restaurant going on top of it.

1932 Commercial Space, Vinyl Tile and Adhesive Off mid-sanding
Mid-project: the field back to bare wood, with new boards woven in along the wall where the old ones had been cut out.

More from this job

Black mastic adhesive and drywall splatter over narrow strip maple flooring in a small room before sanding
The same small room with the adhesive and splatter sanded off, showing raw bare boards
Boards cut out and a section of subfloor exposed with adhesive still on it, ready for new wood to be woven in
New boards laced into the existing floor with the seam filled before sanding
A worn, dusty narrow strip maple hallway under unfinished drywall before sanding
The same hallway with the walls painted and the floor sanded clean and smooth

In-home consultations

Ready to Transform Your Hardwood Floors?

Whether you're restoring original hardwoods, installing new flooring, or simply exploring your options, we'd love to help.